Item Name: Machinery 1920 - 1933

Item ID: Machin-AT1

Collector Rating: 1

Pamphlets Used to Earn this Badge

Requirements October 1914 until April 1923

1. Describe the construction of a lathe, planer, shaper, drill press, and steam boiler; also explain the purpose for which each is intended.

2. Name at least twelve of the principal hand tools used by machinists.

3. Construct a wood or metal model illustrating the principles of levers, gears, pulleys, or block and tackle.

 

Requirements April 1923 and April 1930

1. Describe the construction of a lathe, planer, shaper, drill press, and steam boiler; also explain the purpose for which each is intended.

2. Name at least twelve of the principal hand tools used by machinists.

3. Construct a wood or metal model illustrating the principles of levers, gears, pulleys, or block and tackle.

4. Have at least one month's experience in a shop.

 

Requirements March 1931 until January 1957

1. Describe the construction of a lathe, planer, shaper, drill press, and steam boiler; also explain the purpose for which each is intended.

2. Name at least twelve of the principal hand tools used by machinists.

3. Construct a wood or metal model illustrating the principles of levers, gears, pulleys or black and tackle.