Fig. 1: Pionee-H3-Front
- Embroidery: Cotton thread, dull sheen
- Border: Dk green merrowed
Fig. 2: Pionee-H3-Reverse
- Back: Molded plastic
Item Name: Pioneering 1976 - 1978
Item ID: Pionee-H3
Collector Rating: 1
Requirements 1975 until September 1989
1. Hand coil a length of rope.
2. Describe the following:
(a) Kinds of rope.
(b) Care of rope.
(c) Weakening effect of knots.
3. Tie 10 knots and hitches. Explain how to use them in pioneering.
4. Make a short, end, and eye splice.
5. Build a machine to make rope. Using twine or cord, make a 6-foot rope 1/2 inch or more in diameter. Whip the ends.
6. Make and show one device for moving heavy logs or rocks. Use rope and natural materials. OR use rope to build a conveyor cable system for hauling materials over a ravine or up a steep hillside.
7. Build ONE of the following: log bridge, signal tower, monkey bridge, shelter, or raft.* Take down after use and inspection. Follow an approved design. Use square, diagonal, and shear lashings.
* This may be done in a camp pioneering area using camp poles. Live trees should never be cut without permission of the property owners. Help from another Scout may be used.